Calibrating Registration
PLOTTING 0%
Talk to an Engineer

SHEET USE-NAV-00 · REV A

Company Identity

Who We Are

DWG NO. USE-ABT-00

REV A · JUL 2026

Company Identity Sheet

United Services Egypt (USE)

SHEET 01

EGPC REG. 2005

Legal Name

United Services Egypt

Registration

Egyptian General Petroleum Corporation (EGPC)

Year Established

2005

Headquarters

Cairo, Arab Republic of Egypt

Discipline

Corrosion control · Pipe integrity · Asset protection systems

Markets Served

Oil & Gas · Electricity · Industrial Infrastructure

Strategic Framework

Mission & Vision

SHEET 02 · USE-MV-00

Mission Statement

To deliver specified, qualified, and installed corrosion control systems that extend the operational life of critical oil, gas, and electricity infrastructure — with engineering rigor, field-proven execution, and full standards compliance.

Vision Statement

To be the regional authority in corrosion control engineering — recognized across Egypt, the Middle East, and Africa for technical precision, certified quality, and the ability to protect assets that nations depend on.

Facility Overview

6,000 m² Corrosion Control Center

SHEET 03 · USE-FAC-00

Our dedicated facility houses pipe preparation bays, GRE lining stations, coating application lines, quality inspection laboratories, and field equipment staging. Every process is documented, traceable, and aligned to API and ISO requirements.

6,000

Square meters facility

4

Preparation bays

2

Lining stations

100%

Traceability per joint

Preparation

Abrasive blast bays · Profile measurement · Environmental logging

Application

GRE insertion rigs · Coating spray booths · Tape wrapping stations

Inspection

Holiday detection · Drift mandrel testing · NDT coordination

Logistics

Field crew staging · Equipment calibration · Documentation archive

Company History

Milestones

SHEET 04 · USE-HIST-00

2005

Founded and registered with EGPC. Established as a specialized corrosion control contractor serving Egyptian petroleum operators.

2008

Achieved API Q1 certification. Expanded GRE lining capability with qualified installation crews and drift inspection protocols.

2012

ISO 9001 (DNV), ISO 14001, and ISO 45001 certifications secured. Facility expanded to current 6,000 m² capacity.

2016

International expansion — first major projects in Iraq and KSA. Strategic alliances formed with regional EPC contractors.

2020

RTP systems capability added. RTV insulator coating division launched for electricity sector clients including EEHC.

2026

Operating across Egypt, Iraq, KSA, and UAE. Positioned for Africa expansion with full corrosion control system portfolio.

Regional Presence

Strategic Alliances

SHEET 05 · USE-ALL-00
Egypt
Iraq
KSA
UAE

FIELD CREWS DEPLOYED · EPC PARTNERSHIPS · AFRICA EXPANSION PIPELINE

Next Step

Explore Our Systems